Technical Details


Dehydrated sludge first goes through a batch thermal hydrolysis phase during which steam is injected in reactors operating under specific pressure (9 bar) and temperature (165°C) conditions for approximately 30 minutes.

Dehydrated sludge first goes through a batch thermal hydrolysis phase during which steam is injected in reactors operating under specific pressure (9 bar) and temperature (165°C) conditions for approximately 30 minutes.
4105 rue Sartelon
Saint-Laurent (Québec)
H4S 2B3
Tel. (514) 334-7230
Teléc. (514) 334-5070
------
2000 Argentia Road
Plaza IV, Suite 430
Mississauga, ON
L5N 1W1
Canada
T. (905) 286-4846
F. (905) 286-0488
Veolia Water Technologies China Industrial:Veolia Water Technologies (Shanghai) Co., Ltd
Room 1201-1206 & 1210-1212, CITIC Square,
No. 1168 West Nanjing Road, Jing'an District,
Shanghai 200041, P.R. China
Tel.: +86 21 6193 8088
Fax: +86 21 6193 4498
Veolia Water Technologies China Municipal:VWS (Beijing) Co., Ltd
22/F, Office Building 1 & 2 Tower, Beijing Landmark Tower
8 North Dongsanhuan Road, Caoyang District, Beijing
China 100004
Tel: +86 10 5953 2000
Fax: +86 10 65906822
Serpuhovskiy per.5 bld.3,
15093 Moscow, Russia
Tel.: + 7 921 996 02 96
Windsor Court
Kingsmead Business Park
High Wycombe
Buckinghamshire, HP11 1JU
Tel : +44 (0)1628 897000
Fax : +44 (0)1628 897001
Email Contact Form
Marlow International, Park Way,
Marlow, Bucks
SL7 1YL
tel: +44 (0) 1628 89 70 00
fax: +44 (0) 1628 89 70 01
Email Contact Form
Aqua House
2620 Kings Court
Birmingham Business Park
West Midlands
B37 7YE
United Kingdom
tel: +44 (0)1628 89 6900
fax: +44 (0)1628 89 6901
Email Contact Form